UA LOCAL 179 SASKATCHEWAN
Home - Daily Callout Information

Daily Callout Information - Apr, 2024

FRIDAY APRIL 26TH, 2024

April 26, 2024
CALLS IN:

BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP

EDMONTON EXCHANGER @ CENOVUS SHUTDOWN LLOYDMINISTER

8 JY Pipefitters to work 6x10’s nights Starting May 7th

6 JY Pipefitters to work 6x10’s nights Starting May 10thth

12 JY Pipefitter & 9 JY welders to work days and 16 JY Pipefitters

5 JY Welders to work nights 6X10’S Starting May 12th

13 JY Pipefitters & 8 JY Welders to work days and 15 JY Pipefitters and 5 JY Welders to work nights 6x10’s  Starting May 11th

15 JY Pipefitters & 4 JY Welders to work days 6x10’s Starting May 14thth

19 JY Pipefitters to work days and 15 JY Pipefitters and 10 JY Welders to work nights 6 x 10’s Starting May 15th

5 JY Pipefitters and 2 JY Welders to work 6 x10 nights Starting May 16th
 
(Welders must have F5/F4 & F6/F5)

Shifts will change to 12 & 2 during turn around

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER

4 JY PIPEFITTERS  to work 6x10’s nights Starting May 6th

3 JY PIPEFITTERS  to work 6x10’s nights Starting May 9th

9 JY PIPEFITTERS to work 6x10’s days Starting May 10th
10 JY PIPEFITTERS  &  2 JY WELDER to work 6x10’s nights Starting May 10th

8 JY PIPEFITTERS @ 2 JY WELDERS TO WORK 6X 10’S DAYS  Starting May 11th 

2 JY PIPEFITTERS  TO WORK 6X10’S Days Starting May 12th

7 JY PIPEFITTERS  to work 6x10’s  days and 7  JY PF on nights as well as 4 J Y Welders on days and 2 on nights  Starting May 11th

3 JY PIPEFITTERS  to work 6x10’s nights Starting May 12th

7 JY PIPEFITTERS  &  2 JY WELDER & 2 JY WELDERS (ALLOY) to work 6x10’s nights 
Starting May 13th

(Welders must have F5/F4 & F6/F5)


Calls will be called out Monday Morning.  Have a great weekend!


Thursday April 25th, 2024

April 25, 2024
  

        BFI FAB SHOP @ SASKTOON
        1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


         MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER

9 JY Pipefitters to work 6x10’s days Starting May 10th

4 JY Pipefitters  to work 6x10’s nights Starting May 6th

3 JY Pipefitters to work 6x10’s nights Starting May 9th

10 JY Pipefitters  &  2 JY Welders to work 6x10’s nights Starting May 10th

8 JY Pipefitters @ 2 JY Welders to work 6X 10’S days Starting May 11th

2 JY Pipefitters to work 6X10’S days Starting May 12th

7 JY Pipefitters  to work 6x10’s  days and 7  JY PF on nights as well as 4 JY     Welders on days and 2 on nights  Starting May 13th

3 JY Pipefitters to work 6x10’s nights Starting May 14th

7 JY Pipefitters &  2 JY Welders & 2 JY Welders (ALLOY) to work 6x10’s nights Starting May 15th

(Welders must have F5/F4 & F6/F5)

These calls will be called out Friday morning.  Have a great evening!


Wednesday April 24th, 2024

April 24, 2024
       BALZERS@CCRL SHUTDOWN REGINA
     7 JY   PIPEFITTERS to work nights 6x10's Starting ASAP for 2 weeks+
    (This is ops  assist call working with Co-Op Maintenance)

     BFI FAB SHOP @ SASKTOON
     1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


    CIMS@ERCO WORLDWIDE SASKATOON
    3 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER

12 JY Pipefitters to work 6x10’s days Starting May 10th

4 JY Pipefitters  &  1 JY Welders to work 6x10’s nights Starting May 6th

4 JY Pipefitters &  1 JY Welders to work 6x10’s nights Starting May 9th

10 JY Pipefitters  &  2 JY Welders to work 6x10’s nights Starting May 10th

8 JY Pipefitters @ 2 JY Welders to work 6X 10’S days Starting May 11th

2 JY Pipefitters to work 6X10’S days Starting May 12th

7 JY Pipefitters  to work 6x10’s  days and 7  JY PF on nights as well as 4 JY     Welders on days and 2 on nights  Starting May 13th

3 JY Pipefitters to work 6x10’s nights Starting May 14th

7 JY Pipefitters &  2 JY Welders & 2 JY Welders (ALLOY) to work 6x10’s nights Starting May 15th

(Welders must have F5/F4 & F6/F5)

These calls will be called out Thursday morning.  Have a great evening!


TUESDAY APRIL 23RD, 2024

April 23, 2024
    ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:
    8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting ASAP for 2                weeks 

     BALZERS@CCRL SHUTDOWN REGINA
     7 JY   PIPEFITTERS to work nights 6x10's Starting ASAP for 2 weeks+
    (This is ops  assist call working with Co-Op Maintenance)

     BFI FAB SHOP @ SASKTOON
     1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


    CIMS@ERCO WORLDWIDE SASKATOON
    4 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER

12 JY Pipefitters to work 6x10’s days Starting May 10th

4 JY Pipefitters  &  1 JY Welders to work 6x10’s nights Starting May 6th

4 JY Pipefitters &  1 JY Welders to work 6x10’s nights Starting May 9th

10 JY Pipefitters  &  2 JY Welders to work 6x10’s nights Starting May 10th

8 JY Pipefitters @ 2 JY Welders to work 6X 10’S days Starting May 11th

2 JY Pipefitters to work 6X10’S days Starting May 12th

7 JY Pipefitters  to work 6x10’s  days and 7  JY PF on nights as well as 4 JY     Welders on days and 2 on nights  Starting May 13th

3 JY Pipefitters to work 6x10’s nights Starting May 14th

7 JY Pipefitters &  2 JY Welders & 2 JY Welders (ALLOY) to work 6x10’s nights Starting May 15th

(Welders must have F5/F4 & F6/F5)

These calls will be called out Wednesday morning.  Have a great evening!


MONDAY APRIL 22ND, 2024

April 22, 2024
        ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

      8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting ASAP  for 2                       weeks+  

      EDMONTON EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

     1 JY PIPEFITTERS  to work days 10 on and 4 off starting ASAP

     BALZERS@CCRL SHUTDOWN REGINA

     7 JY   PIPEFITTERS to work nights 6x10's Starting ASAP for 2 weeks+
     (This is ops  assist call working with Co-Op Maintenance)

    BFI FAB SHOP @ SASKTOON

    1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


      CIMS@ERCO WORLDWIDE SASKATOON

      4 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's


       These calls will be called out Tuesday morning.  Have a great evening!

FRIDAY APRIL 19TH, 2024

April 19, 2024
     ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

      8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting ASAP  for 2                       weeks+  

      EDMONTON EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

      3 JY PIPEFITTERS  to work days 10 on and 4 off starting ASAP

     BALZERS@CCRL SHUTDOWN REGINA

     7 JY   PIPEFITTERS to work nights 6x10's Starting Apr 22 for 2 weeks+
     (This is ops  assist call working with Co-Op Maintenance)

    BFI FAB SHOP @ SASKTOON

    1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


      CIMS@ERCO WORLDWIDE SASKATOON

      4 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's


       These calls will be called out MONDAY morning.  Have a great weekend!

         **REMINDER**

           There is a General Meeting being held this Sat April 20th at the Ramada Hotel in Saskatoon
           @806 Idylwyld Drive   11:00 am

THURSDAY APRIL 18TH, 2024

April 18, 2024
ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

   8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting APRIL 15TH, 2024    for 2 weeks plus.

   EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
 5 JY PIPEFITTERS  to work days 10 on and 4 off starting Apr 17th 

     BALZERS@CCRL SHUTDOWN REGINA
   7 JY   PIPEFITTERS to work nights 6x10's Starting Apr 22 for 2 weeks+
    (This is ops  assist call working with Co-Op Maintenance)

    BFI FAB SHOP @ SASKTOON

    1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


CIMS@ERCO WORLDWIDE SASKATOON

4 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's


       These calls will be called out Friday morning.  Have a great evening!!

**REMINDER**

There is a General Meeting being held this Sat April 20th at the Ramada Hotel in Saskatoon
 @806 Idylwyld Drive   11:00 am

WEDNESDAY APRIL 17TH, 2024

April 17, 2024
   ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

    8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting APRIL 15TH, 2024          for 2 weeks plus.

   EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

    2  WELDER (F3/F4) AND  8 JY PIPEFITTERS  to work days 10 on and 4 off starting Apr 17th 

     BALZERS@CCRL SHUTDOWN REGINA
    12 JY   PIPEFITTERS to work nights 6x10's Starting Apr 22 for 2 weeks+
    (This is ops  assist call working with Co-Op Maintenance)

    BFI FAB SHOP @ SASKTOON

    1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


    CIMS@ERCO WORLDWIDE SASKATOON

     4 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's


       These calls will be called out Thursday  morning.  Have a great evening!!

-------------------------------------------------------------------------------------------------------------------------------------

For all jobs below, please contact Mitch Greiner at 306-956-1063

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap


LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.


BLACK & MCDONALD @ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE   To work days 5 X 8'S with potential overtime to start asap.


AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.


EDCO @ REGINA

1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S  to start asap.

TUESDAY APR 16TH, 2024

April 16, 2024
  ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

   8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting APRIL 15TH, 2024    for 2 weeks plus.

   EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

    2  WELDER (F3/F4) AND 10 JY PIPEFITTERS  to work days 10 on and 4 off starting Apr 17th 


   ICON CONTRUCTION @CORY COGEN 

    2 JY PF to work days 5 x10's Starting April 22

    BFI FAB SHOP @ SASKTOON

    1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP


CIMS@ERCO WORLDWIDE SASKATOON

4 JY PF  working days Starting May 3rd  1 8hr shift and 4 12's


       These calls will be called out Wednesday  morning.  Have a great evening!!

---------------------------------------------------------------------------------------------------------------------------------

For all jobs below, please contact Mitch Greiner at 306-956-1063

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap


LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.


BLACK&MCDONALD @ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE   To work days 5 X 8'S with potential overtime to start asap.


AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.


EDCO @ REGINA

1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S  to start asap.

MONDAY APRIL 15TH, 2024

April 15, 2024
ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

8 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting APRIL 15TH, 2024 for 2 weeks plus.

   EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

2  WELDER (F3/F4) AND 10 JY PIPEFITTERS  to work days 10 on and 4 off starting Apr 17th 


ICON CONTRUCTION @CORY COGEN 

2 JY PF to work days 5 x10's Starting April 22

BFI FAB SHOP @ SASKTOON

1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP

THESE CALLS WILL BE CALLED OUT TUESDAY  MORNING.  HAVE A GREAT NIGHT

 APRIL 15TH   2 WEEKS +


EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

2 WELDERS (F3/4 F5/6) AND 15  JY PF   to work days 10 on 4 off starting Apr 15th

  

 CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  


ICON CONTRUCTION @CORY COGEN 

2 JY PF to work days 5 x10's Starting April 22


 PCL MELLOY @ CENOVUS LLOYDMINSTER

 2 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH


     BFI FAB SHOP @ SASKATOON

   1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week


       These calls will be called out Friday  morning.  Have a great evening!

---------------------------------------------------------------------------------------------------------------------------------

For all jobs below, please contact Mitch Greiner at 306-956-1063

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap


LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.


BLACK&MCDONALD @ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE   To work days 5 X 8'S with potential overtime to start asap.


AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.


EDCO @ REGINA

1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S  to start asap.

FRIDAY APRIL 12TH, 2024

April 12, 2024

ALTEX@CCRL REGINA

 8 JY PIPEFITTERS TO WORK DAYS AND ANOTHER 10 TO WORK NIGHTS STARTING     APRIL 15TH   2 WEEKS +


EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

2 WELDERS (F3/4 F5/6) AND 15  JY PF   to work days 10 on 4 off starting Apr 15th

  

 CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  


ICON CONTRUCTION @CORY COGEN 

2 JY PF to work days 5 x10's Starting April 22


 PCL MELLOY @ CENOVUS LLOYDMINSTER

 2 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH


     BFI FAB SHOP @ SASKATOON

   1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week


       These calls will be called out Friday  morning.  Have a great evening!

---------------------------------------------------------------------------------------------------------------------------------

For all jobs below, please contact Mitch Greiner at 306-956-1063

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap


LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.


BLACK&MCDONALD @ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE   To work days 5 X 8'S with potential overtime to start asap.


AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.


EDCO @ REGINA

1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S  to start asap.

THURSDAY APR 11, 2024

April 11, 2024
ALTEX @ CCRL REGINA SHUTDOWN    LOOKING FOR:

10 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting APRIL 15TH, 2024 for 2 weeks plus.

   EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

2  WELDER (F3/F4) AND 15 JY PIPEFITTERS  to work days 10 on and 4 off starting Apr 17th 


 CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  


ICON CONTRUCTION @CORY COGEN 

2 JY PF to work days 5 x10's Starting April 22

 PCL MELLOY @ CENOVUS LLOYDMINSTER

5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

THESE CALLS WILL BE CALLED OUT FRIDAY MORNING.  HAVE A GEAT NIGHT

WEDNESDAY APR 10, 2024

April 10, 2024

CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

7 JY PIPEFITTERS   to work days and  10 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

 

 BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+


  EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

1 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

1 WELDER (F3/F4) AND 7 JY PIPEFITTERS  to work days 10 on and 4 off starting Apr 17t

 

 CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  


ICON CONTRUCTION @CORY COGEN 

2 JY PF to work days 5 x10's Starting April 22


 PCL MELLOY @ CENOVUS LLOYDMINSTER

5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH     BFI FAB SHOP @SASKATOON

1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week


 VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN

 1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10  

Starting May 1, 2024.


       These calls will be called out Thursday morning.  Have a great evening!

---------------------------------------------------------------------------------------------------------------------------------

For all jobs below, please contact Mitch Greiner at 306-956-1063

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap


LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.


VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.


BLACK&MCDONALD @ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE   To work days 5 X 8'S with potential overtime to start asap.


AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.


EDCO @ REGINA

1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S  to start asap.

 

TUESDAY APRIL 9TH, 2024

April 9, 2024

CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

9JY PIPEFITTERS   to work days and  11 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

 

 BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+


  EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

1 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

1 WELDER (F3/F4) AND 8 JY PIPEFITTERS  t9o work days 10 on and 4 off starting Apr 17th 


 CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  


ICON CONTRUCTION @CORY COGEN 

2 JY PF to work days 5 x10's Starting April 22

 PCL MELLOY @ CENOVUS LLOYDMINSTER

5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

    BFI FAB SHOP @SASKATOON

1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week

 VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN

 1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10  

Starting May 1, 2024.

        These calls will be called out WEDNESDAY morning.  Have a great evening!

MONDAY APRIL 8TH, 2024

April 8, 2024

CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

9JY PIPEFITTERS   to work days and  11 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

 

 BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+


  EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

1 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

 

CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  

 

PCL MELLOY @ CENOVUS LLOYDMINSTER

5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

  BFI FAB SHOP @SASKATOON

1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week

 VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN

 1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.

RAM STEEL@MOSAIC BELLE PLAINE

1 JY WELDER (F3F4) TO START APR 8 

        These calls will be called out Tuesday morning.  Have a great evening!

FRIDAY APRIL 5TH, 2024

April 5, 2024

CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

9JY PIPEFITTERS   to work days and  11 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

 

 BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+


  EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

1 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

 

CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  

 

PCL MELLOY @ CENOVUS LLOYDMINSTER

5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

  BFI FAB SHOP @SASKATOON

1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week

 VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN

 1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.

RAM STEEL@MOSAIC BELLE PLAINE

1 JY WELDER (F3F4) TO START APR 8 

        These calls will be called out Tuesday morning.  Have a great evening!

APRIL 4, 2024

April 4, 2024

CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

 6 JY PIPEFITTERS   to work days and  12 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

 

ALTEX INDUSTRIES@ CCRL REGINA SHUTDOWN    LOOKING FOR :

  9 JY PIPEFITTERS to work days  and 6 PIPEFITTERS to work nights starting APRIL 11 For 2 weeks plus.

 B ALZERS@CCRL REGINA SHUTDOWN   (ops assist)     


  EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

1 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

 

CIMS@ERCO WORLDWIDE SASKATOON

1 JY WELDER (F3/F4) working days starting Apr 15th  

 

PCL MELLOY @ CENOVUS LLOYDMINSTER

 1 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

  BFI FAB SHOP @SASKATOON

 2 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week

 VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN

 1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 3 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.

These calls will be called out  FRIDAY morning.  Have a great evening.

WEDNESDAY APR 3, 2024

April 3, 2024

CM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

 6 JY PIPEFITTERS   to work days and  12 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

 

ALTEX INDUSTRIES@ CCRL REGINA SHUTDOWN    LOOKING FOR :

  9 JY PIPEFITTERS to work days  and 6 PIPEFITTERS to work nights starting APRIL 11 For 2 weeks plus.

 

 

BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

 1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+

 

 

ICON @ CORY COGEN (Saskatoon)

 1 JY PIPEFITTER to work 5x10'S Starting April 15  2 weeks +

 

EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

3 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

 

CIMS@ERCO WORLDWIDE SASKATOON

 1 JY PIPEFITTER AND 1 JY WELDER (F3/F4) working days starting Apr 15th  

 

PCL MELLOY @ CENOVUS LLOYDMINSTER

 1 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

 

RAM STEEL @MOSAIC BELLE PLAINE 

 1 JY WELDER to work 5 days starting APR 8th

  BFI FAB SHOP @SASKATOON

 2 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week

 

VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN

 1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 3 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.

These calls will be called out Thursday morning.  Have a great evening.

TUESDAY APR 2, 2024

April 2, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

6 JY PIPEFITTERS   to work days and  12 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

ALTEX INDUSTRIES@ CCRL REGINA SHUTDOWN    LOOKING FOR :

10 JY PIPEFITTERS to work days  and 9  PIPEFITTERS to work nights starting APRIL 11 For 2 weeks plus.


BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+


ICON @ CORY COGEN (Saskatoon)

1 JY PIPEFITTER to work 5x10'S Starting April 15  2 weeks +
1 JY PIPEFITTER to work 5x10'S Starting April 22  2 weeks +

EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

2 JY PIPEFITTERS AND 3 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th

CIMS@ERCO WORLDWIDE SASKATOON

1 JY PIPEFITTER AND 1 JY WELDER (F3/F4) working days  starting Apr 15th  

PCL MELLOY @ CENOVUS LLOYDMINSTER

2 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH 

RAM STEEL @MOSAIC BELLE PLAINE 

1 JY WELDER to work 5 days starting APR 8th


These calls will be called out Wednesday   morning.  Have a great evening.

MONDAY APR 1, 2024

April 1, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN    LOOKING FOR:

6 JY PIPEFITTERS   to work days and  15 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.

ALTEX INDUSTRIES@ CCRL REGINA SHUTDOWN    LOOKING FOR :

6 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024  For 2 weeks plus.

3 JY PIPEFITTERS   to work days starting Apr 12TH and 5 JY PIPEFITTERS to work nights starting APRIL 12TH, 2024  For 2 weeks plus.

BALZERS@CCRL REGINA SHUTDOWN   (ops assist)     

1 JY PIPEFITTERS to work days  6X10'S STARTING ASAP 6 WEEKS+


ICON @ CORY COGEN (Saskatoon)

1 JY PIPEFITTER to work 5x10'S Starting April 15  2 weeks +
1 JY PIPEFITTER to work 5x10'S Starting April 22  2 weeks +

EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER

3 JY PIPEFITTERS AND 4 WELDERS (F3/4 F5/6)  to work days 10 on 4 off starting Apr 15th


These calls will be called out Tuesday  morning.  Have a great evening.

 

Daily Callout Archive

Apr, 2024   Mar, 2024   Feb, 2024   Jan, 2024   Dec, 2023   Nov, 2023   Oct, 2023   Sep, 2023   Aug, 2023   Jul, 2023   Jun, 2023   May, 2023   Apr, 2023   Mar, 2023   Feb, 2023   Jan, 2023   Dec, 2022   Nov, 2022   Oct, 2022   Sep, 2022   Aug, 2022   Jul, 2022   Jun, 2022   May, 2022   Apr, 2022   Mar, 2022   Feb, 2022   Jan, 2022   Dec, 2021   Nov, 2021   Oct, 2021   Sep, 2021   Aug, 2021   Jul, 2021   Jun, 2021   May, 2021   Apr, 2021   Mar, 2021   Feb, 2021   Jan, 2021  
 

Looking for a career in the Piping Trades?

APPLY NOW

LOCAL 179 NEWS

GENERAL MEETING

GENERAL MEETING

GENERAL MEETING

Hot Job Notice

More News >>

MEMORIAL

Passing of UA Local 179 member Greg Henderson

Passing of UA 179 Member Ronald "Ron" Johnson

Passing of UA 179 Life member Ferdinand Janke

Passing of UA Member Attila "Audie" Abram

More Memorial News >>

NOTICES

Unemployed Workers Help Centre If you hear family, friends, neighbors', etc mentioning they are or someone they know is having issues with EI, you can tell them that there is an outfit, the UWHC, which is supported by your union that gives help to any worker having trouble with their EI claim. Check out the website by clicking the link below: http://www.unemployedworkerscentre.org/

Click the image below to read

UA CANADA NEWS
FACEBOOK

UA Local 179

402 Solomon Drive, Regina, Saskatchewan S4N 5A8
Tel: 306-569-0624
Fax: 306-781-8052
Toll Free: 1-877-893-2179 (in Saskatchewan only)
Call Out Line: 306-569-3641
Email: mail@ualocal179.ca