Home - Daily Callout Information
Daily Callout Information - Apr, 2024
APRIL 29th, 2024
April 29, 2024
FRIDAY APRIL 26TH, 2024
April 26, 2024
Thursday April 25th, 2024
April 25, 2024
9 JY Pipefitters to work 6x10’s days Starting May 10th
4 JY Pipefitters to work 6x10’s nights Starting May 6th
3 JY Pipefitters to work 6x10’s nights Starting May 9th
10 JY Pipefitters & 2 JY Welders to work 6x10’s nights Starting May 10th
8 JY Pipefitters @ 2 JY Welders to work 6X 10’S days Starting May 11th
2 JY Pipefitters to work 6X10’S days Starting May 12th
7 JY Pipefitters to work 6x10’s days and 7 JY PF on nights as well as 4 JY Welders on days and 2 on nights Starting May 13th
3 JY Pipefitters to work 6x10’s nights Starting May 14th
7 JY Pipefitters & 2 JY Welders & 2 JY Welders (ALLOY) to work 6x10’s nights Starting May 15th
(Welders must have F5/F4 & F6/F5)
These calls will be called out Friday morning. Have a great evening!
Wednesday April 24th, 2024
April 24, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER
12 JY Pipefitters to work 6x10’s days Starting May 10th
4 JY Pipefitters & 1 JY Welders to work 6x10’s nights Starting May 6th
4 JY Pipefitters & 1 JY Welders to work 6x10’s nights Starting May 9th
10 JY Pipefitters & 2 JY Welders to work 6x10’s nights Starting May 10th
8 JY Pipefitters @ 2 JY Welders to work 6X 10’S days Starting May 11th
2 JY Pipefitters to work 6X10’S days Starting May 12th
7 JY Pipefitters to work 6x10’s days and 7 JY PF on nights as well as 4 JY Welders on days and 2 on nights Starting May 13th
3 JY Pipefitters to work 6x10’s nights Starting May 14th
7 JY Pipefitters & 2 JY Welders & 2 JY Welders (ALLOY) to work 6x10’s nights Starting May 15th
(Welders must have F5/F4 & F6/F5)
These calls will be called out Thursday morning. Have a great evening!
TUESDAY APRIL 23RD, 2024
April 23, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER
12 JY Pipefitters to work 6x10’s days Starting May 10th
4 JY Pipefitters & 1 JY Welders to work 6x10’s nights Starting May 6th
4 JY Pipefitters & 1 JY Welders to work 6x10’s nights Starting May 9th
10 JY Pipefitters & 2 JY Welders to work 6x10’s nights Starting May 10th
8 JY Pipefitters @ 2 JY Welders to work 6X 10’S days Starting May 11th
2 JY Pipefitters to work 6X10’S days Starting May 12th
7 JY Pipefitters to work 6x10’s days and 7 JY PF on nights as well as 4 JY Welders on days and 2 on nights Starting May 13th
3 JY Pipefitters to work 6x10’s nights Starting May 14th
7 JY Pipefitters & 2 JY Welders & 2 JY Welders (ALLOY) to work 6x10’s nights Starting May 15th
(Welders must have F5/F4 & F6/F5)
These calls will be called out Wednesday morning. Have a great evening!
MONDAY APRIL 22ND, 2024
April 22, 2024
FRIDAY APRIL 19TH, 2024
April 19, 2024
THURSDAY APRIL 18TH, 2024
April 18, 2024
WEDNESDAY APRIL 17TH, 2024
April 17, 2024
For all jobs below, please contact Mitch Greiner at 306-956-1063
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK & MCDONALD @ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE To work days 5 X 8'S with potential overtime to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
EDCO @ REGINA
1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S to start asap.
TUESDAY APR 16TH, 2024
April 16, 2024
CIMS@ERCO WORLDWIDE SASKATOON
4 JY PF working days Starting May 3rd 1 8hr shift and 4 12's
These calls will be called out Wednesday morning. Have a great evening!!
---------------------------------------------------------------------------------------------------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK&MCDONALD @ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE To work days 5 X 8'S with potential overtime to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
EDCO @ REGINA
1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S to start asap.
MONDAY APRIL 15TH, 2024
April 15, 2024
APRIL 15TH 2 WEEKS +
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
2 WELDERS (F3/4 F5/6) AND 15 JY PF to work days 10 on 4 off starting Apr 15th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
ICON CONTRUCTION @CORY COGEN
2 JY PF to work days 5 x10's Starting April 22
PCL MELLOY @ CENOVUS LLOYDMINSTER
2 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
BFI FAB SHOP @ SASKATOON
1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
These calls will be called out Friday morning. Have a great evening!
---------------------------------------------------------------------------------------------------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK&MCDONALD @ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE To work days 5 X 8'S with potential overtime to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
EDCO @ REGINA
1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S to start asap.
FRIDAY APRIL 12TH, 2024
April 12, 2024
ALTEX@CCRL REGINA
8 JY PIPEFITTERS TO WORK DAYS AND ANOTHER 10 TO WORK NIGHTS STARTING APRIL 15TH 2 WEEKS +
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
2 WELDERS (F3/4 F5/6) AND 15 JY PF to work days 10 on 4 off starting Apr 15th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
ICON CONTRUCTION @CORY COGEN
2 JY PF to work days 5 x10's Starting April 22
PCL MELLOY @ CENOVUS LLOYDMINSTER
2 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
BFI FAB SHOP @ SASKATOON
1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
These calls will be called out Friday morning. Have a great evening!
---------------------------------------------------------------------------------------------------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK&MCDONALD @ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE To work days 5 X 8'S with potential overtime to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
EDCO @ REGINA
1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S to start asap.
THURSDAY APR 11, 2024
April 11, 2024
WEDNESDAY APR 10, 2024
April 10, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN LOOKING FOR:
7 JY PIPEFITTERS to work days and 10 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.
BALZERS@CCRL REGINA SHUTDOWN (ops assist)
1 JY PIPEFITTERS to work days 6X10'S STARTING ASAP 6 WEEKS+
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
1 WELDERS (F3/4 F5/6) to work days 10 on 4 off starting Apr 15th
1 WELDER (F3/F4) AND 7 JY PIPEFITTERS to work days 10 on and 4 off starting Apr 17t
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
ICON CONTRUCTION @CORY COGEN
2 JY PF to work days 5 x10's Starting April 22
PCL MELLOY @ CENOVUS LLOYDMINSTER
5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH BFI FAB SHOP @SASKATOON
1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN
1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10
Starting May 1, 2024.
These calls will be called out Thursday morning. Have a great evening!
---------------------------------------------------------------------------------------------------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK&MCDONALD @ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXPERIENCE To work days 5 X 8'S with potential overtime to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
EDCO @ REGINA
1 JY SERVICE PLUMBER with HVAC experience.To work days 5 X 8'S to start asap.
TUESDAY APRIL 9TH, 2024
April 9, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN LOOKING FOR:
9JY PIPEFITTERS to work days and 11 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.
BALZERS@CCRL REGINA SHUTDOWN (ops assist)
1 JY PIPEFITTERS to work days 6X10'S STARTING ASAP 6 WEEKS+
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
1 WELDERS (F3/4 F5/6) to work days 10 on 4 off starting Apr 15th
1 WELDER (F3/F4) AND 8 JY PIPEFITTERS t9o work days 10 on and 4 off starting Apr 17th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
ICON CONTRUCTION @CORY COGEN
2 JY PF to work days 5 x10's Starting April 22
PCL MELLOY @ CENOVUS LLOYDMINSTER
5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
BFI FAB SHOP @SASKATOON
1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN
1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10
Starting May 1, 2024.
These calls will be called out WEDNESDAY morning. Have a great evening!
MONDAY APRIL 8TH, 2024
April 8, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN LOOKING FOR:
9JY PIPEFITTERS to work days and 11 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.
BALZERS@CCRL REGINA SHUTDOWN (ops assist)
1 JY PIPEFITTERS to work days 6X10'S STARTING ASAP 6 WEEKS+
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
1 WELDERS (F3/4 F5/6) to work days 10 on 4 off starting Apr 15th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
PCL MELLOY @ CENOVUS LLOYDMINSTER
5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
BFI FAB SHOP @SASKATOON
1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN
1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.
RAM STEEL@MOSAIC BELLE PLAINE
1 JY WELDER (F3F4) TO START APR 8
FRIDAY APRIL 5TH, 2024
April 5, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN LOOKING FOR:
9JY PIPEFITTERS to work days and 11 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.
BALZERS@CCRL REGINA SHUTDOWN (ops assist)
1 JY PIPEFITTERS to work days 6X10'S STARTING ASAP 6 WEEKS+
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
1 WELDERS (F3/4 F5/6) to work days 10 on 4 off starting Apr 15th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
PCL MELLOY @ CENOVUS LLOYDMINSTER
5 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
BFI FAB SHOP @SASKATOON
1 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN
1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 1 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.
RAM STEEL@MOSAIC BELLE PLAINE
1 JY WELDER (F3F4) TO START APR 8
APRIL 4, 2024
April 4, 2024
CAM INDUSTRIAL SOLUTIONS @ CCRL REGINA SHUTDOWN LOOKING FOR:
6 JY PIPEFITTERS to work days and 12 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.
ALTEX INDUSTRIES@ CCRL REGINA SHUTDOWN LOOKING FOR :
9 JY PIPEFITTERS to work days and 6 PIPEFITTERS to work nights starting APRIL 11 For 2 weeks plus.
B ALZERS@CCRL REGINA SHUTDOWN (ops assist)
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
1 WELDERS (F3/4 F5/6) to work days 10 on 4 off starting Apr 15th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY WELDER (F3/F4) working days starting Apr 15th
PCL MELLOY @ CENOVUS LLOYDMINSTER
1 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
BFI FAB SHOP @SASKATOON
2 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN
1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 3 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.
WEDNESDAY APR 3, 2024
April 3, 2024
CM INDUSTRIAL SOLUTIONS @ CCRL REGINA
SHUTDOWN LOOKING FOR:
6 JY PIPEFITTERS to work days and 12 JY PIPEFITTERS to work nights starting APRIL 11TH, 2024 for 2 weeks plus.
ALTEX INDUSTRIES@ CCRL REGINA SHUTDOWN LOOKING FOR :
9 JY PIPEFITTERS to work days and 6 PIPEFITTERS to work nights starting APRIL 11 For 2 weeks plus.
BALZERS@CCRL REGINA SHUTDOWN (ops
assist)
1 JY PIPEFITTERS to work days 6X10'S STARTING ASAP 6 WEEKS+
ICON @ CORY COGEN (Saskatoon)
1 JY PIPEFITTER to work 5x10'S Starting April 15 2 weeks +
EDMONTOIN EXHANGER @ CENOVUS SHUTDOWN LLOYDMINSTER
3 WELDERS (F3/4 F5/6) to work days 10 on 4
off starting Apr 15th
CIMS@ERCO WORLDWIDE SASKATOON
1 JY PIPEFITTER AND 1 JY WELDER (F3/F4) working days starting Apr 15th
PCL MELLOY @ CENOVUS LLOYDMINSTER
1 JY PIPEFITTER working days 10 ON 4 OFF STARTING APR 15TH
RAM STEEL @MOSAIC BELLE PLAINE
1 JY WELDER to work 5 days starting APR 8th
BFI FAB SHOP @SASKATOON
2 JY PIPEFITTER 2 JY WELDERS APR 15TH working day 4 x10’s for 1 week
VENSHORE MECHANICAL TC ENERGY STATION MOOSEMIN
1 JY PIPEFITTER, 1 JY WELDR (F3/F4) 3 JY INSTRUMENT MECHANICS working days 6 x10 Starting May 1, 2024.
TUESDAY APR 2, 2024
April 2, 2024
MONDAY APR 1, 2024
April 1, 2024
Daily Callout Archive
Feb, 2025 Jan, 2025 Dec, 2024 Nov, 2024 Oct, 2024 Sep, 2024 Aug, 2024 Jul, 2024 Jun, 2024 May, 2024 Apr, 2024 Mar, 2024 Feb, 2024 Jan, 2024 Dec, 2023 Nov, 2023 Oct, 2023 Sep, 2023 Aug, 2023 Jul, 2023 Jun, 2023 May, 2023 Apr, 2023 Mar, 2023 Feb, 2023 Jan, 2023 Dec, 2022 Nov, 2022 Oct, 2022 Sep, 2022 Aug, 2022 Jul, 2022 Jun, 2022 May, 2022 Apr, 2022 Mar, 2022 Feb, 2022 Jan, 2022 Dec, 2021 Nov, 2021 Oct, 2021 Sep, 2021 Aug, 2021 Jul, 2021 Jun, 2021 May, 2021 Apr, 2021 Mar, 2021 Feb, 2021 Jan, 2021Looking for a career in the Piping Trades?
LOCAL 179 NEWS
COMET COURSE - Feb. 21st, 2025 in Regina
Partnership with Enriched Academy!
GENERAL MEMBERSHIP MEETING JAN 18TH REGINA
MEMORIAL
NOTICES
Click the image below to read
