Home - Daily Callout Information
Daily Callout Information - May, 2024
FRIDAY MAY 31, 2024
May 31, 2024
BFI FAB SHOP @ SASKTOON
2 JY WELDERS to work days 4 x10's STARTING ASAP
SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
RAM STEEL @ NUTRIEN VANSCOY
1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
11 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only
15 PF TO WORK DAY STARTING ASAP
15 PF TO WORK NIGHTS STARTING ASAP
These calls will be called out on Monday Morning. That concludes our information. Have a great weekend !
THURSDAY MAY 30TH, 2024
May 30, 2024
BFI FAB SHOP @ SASKTOON
2 JY WELDERS to work days 4 x10's STARTING ASAP
SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
RAM STEEL @ NUTRIEN VANSCOY
1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
BRECK CONSTRUCTION@KEY LAKE
LOOING FOR 1 JY WELDER (F3/F4) WORK FOR 2 WEEKS ON 2 WEEKS OFF STARTING JUNE 7, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
11 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
10 PF AND 3 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out on Friday Morning. That concludes our information. Have a great evening !
WEDNESDAY MAY 29TH, 2024
May 29, 2024
BFI FAB SHOP @ SASKTOON
2 JY WELDERS to work days 4 x10's STARTING ASAP
SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
RAM STEEL @ NUTRIEN VANSCOY
1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
BRECK CONSTRUCTION@KEY LAKE
LOOING FOR 1 JY WELDER (F3/F4) TO WORK 2 WEEKS ON 2 WEEKS OFF STARTING JUNE 7, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
11 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
14 PF AND 3 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out on Thursday Morning. That concludes our information. Have a great evening !
TUESDAY MAY 28TH , 2024
May 28, 2024
BFI FAB SHOP @ SASKTOON
2 JY WELDERS to work days 4 x10's STARTING ASAP
SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
RAM STEEL @ NUTRIEN VANSCOY
1 JY PIPEFITTERS and 1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
BRECK CONSTRUCTION@KEY LAKE
LOOING FOR 1 JY WELDER (F3/F4) WORK 2EEKS ON 2 WEEKS OFF STARTING JUNE 7, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
14 PF AND 3 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out on Wednesday Morning. That concludes our information. Have a great evening !
MONDAY MAY 27TH, 2024
May 27, 2024
BFI FAB SHOP @ SASKTOON
2 JY WELDERS to work days 4 x10's STARTING ASAP
SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
RAM STEEL @ NUTRIEN VANSCOY
2 JY PIPEFITTERS and 1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
14 PF AND 3 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out on Tuesday Morning. That concludes our information. Have a great evening !
FRIDAY MAY 24TH, 2024
May 24, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
RAM STEEL @ NUTRIEN VANSCOY
2 JY PIPEFITTERS and 1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
16 PF AND 3 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out on Monday Morning. That concludes our information. Have a great weekend!
----------------------------------------------------------------------------------------------------------------------------------------------
COMMERCIAL CALL OUT
------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063
POW CITY @ VARIOUS PROJECTS
LOOKING FOR 3 JY PLUMBERS FOR LONG TERM JOB STARTING MAY 27TH
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK & MCDONALD @ ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXP. To work days 5 X 8'S with potential OT. to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
THURSDAY MAY 23, 2024
May 23, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
RAM STEEL @ NUTRIEN VANSCOY
2 JY PIPEFITTERS and 1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
18 PF AND 4 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out Friday Morning. That concludes our information. Have a great evening!
COMMERCIAL CALL OUT
------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063
POW CITY @ VARIOUS PROJECTS
LOOKING FOR 3 JY PLUMBERS FOR LONG TERM JOB STARTING MAY 27TH
CIMCO@MCARTHUR RIVER MINE SITE
1 JY REFRIGERATION TECH w/amonia exp. Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap
LEGACY FIRE PROTECTION @ SASKATOON (local projects)
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VANDERSDTELT FIRE PROTECTION@SASKATOON
2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.
VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA
2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.
BLACK & MCDONALD @ ESTEVAN
2 JY REFRIGERATION TECHS W/SERVICE EXP. To work days 5 X 8'S with potential OT. to start asap.
AINSWORTH @ SASKATOON
1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.
These calls will be called out Friday Morning. That concludes our information. Have a great evening!
WEDNESDAY MAY 22, 2024
May 22, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
1 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+
RAM STEEL @ NUTRIEN VANSCOY
2 JY PIPEFITTERS and 1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
3 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
18 PF AND 4 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out Thursday Morning. That concludes our information. Have a great evening!
TUESDAY MAY 21, 2024
May 21, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
1 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+
RAM STEEL @ NUTRIEN VANSCOY
4 JY PIPEFITTERS and 1 JY WELDER TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
10 PIPEFITTERS AND 1 WELDER TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
18 PF AND 4 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out Wednesday Morning. That concludes our information. Have a great evening!
FRIDAY MAY 17TH, 2024
May 17, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+
BRECK CONSTRUCTION @COTEAU CREEK
1 JY PIPEFITTER WORKING DAYS 4X10 STARTING MAY 27TH FOR 2 WEEKS+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
11 IPEFITTERS TO WORK NIGHTS STARTING ASAP
15 PIPEFITTERS TO WORK DAYS STARTING ASAP
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
23 PF AND 6 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out next Tuesday Morning. That concludes our information. Have a great long weekend!!
THURSDAY MAY 16TH, 2024
May 16, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+
BRECK CONSTRUCTION @COTEAU CREEK
1 JY PIPEFITTER WORKING DAYS 4X10 STARTING MAY 27TH FOR 2 WEEKS+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Shifts are 6 x 10’s**
12 IPEFITTERS TO WORK NIGHTS STARTING ASAP
18 PIPEFITTERS TO WORK DAYS STARTING ASAP
(Welders must have F3/F4 & F6/F5)
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
26 PF AND 6 WELDERS TO WORK NIGHTS STARTING ASAP
These calls will be called out Friday Morning. That concludes our information. Have a great evening!
WEDNESDAY MAY 15TH, 2024
May 15, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+
BRECK CONSTRUCTION @COTEAU CREEK
2 JY PIPEFITTER WORKING DAYS 4X10 STARTING MAY 27TH FOR 2 WEEKS+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
12 IPEFITTERS TO WORK NIGHTS STARTING ASAP
20 PIPEFITTERS TO WORK DAYS STARTING MAY 21
(Welders must have F3/F4 & F6/F5)
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
26 PF AND 7 WELDERS TO WORK NIGHTS STARTING ASAP
1 WELDERS TO WORK DAYS STARTING ASAP
These calls will be called out Thursday Morning. That concludes our information. Have a great evening!
TUESDAY MAY 14TH, 2024
May 14, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JYPF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+
SERVCO CANADA@ FAB SHOP REGINA
1JY OF ANF 1 JY WELDER WITH f6/f5 WORKING FAY 4X/10 STARTING MAY 27TH FOR 2 WEEKS+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
1 PF TO WORK NIGHTS STARTING ASAP
7 PF TO WORK NIGHTS START5ING MAY 10TH
4 PF TO WORK NIGHTS STARTING MAY 11TH
1 PF TO WORK NIGHTS STARTING MAY 13TH
(Welders must have F3/F4 & F6/F5)
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
6 PF AND 3 WELDERS TO WORK NIGHTS STARTING MAY 12TH
1 WELDERS TO WORK DAYS STARTING MAY 13TH
13 PF AND 1 WELDERS TO WORK NIGHTS STARTING MAY 13TH
10 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 14TH
2 PF TO WORK TO WORK NIGHTS STARTING MAY 15TH
1 WELDER TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Wednesday Morning. That concludes our information. Have a great evening!
MONDAY MAY 13TH, 2024
May 13, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
AARON GRATIS WELDING@CORY COGEN
1 JY WELDER (F3/F4/ AND F6/F5 WORKING 4 X10'S 2 WEEKS PLUS
FUSION INDUSTRIAL CONTRACTORS @ VANCOY
2 JY PF AND 1 JY WELDER TO WORK DAYS STARTING MAY 27 FOR 1 WEEK+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
1 PF TO WORK NIGHTS STARTING ASAP
7 PF TO WORK NIGHTS START5ING MAY 10TH
5 PF TO WORK NIGHTS STARTING MAY 11TH
1 PF TO WORK NIGHTS STARTING MAY 13TH
(Welders must have F3/F4 & F6/F5)
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
8 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 12TH
1 WELDERS TO WORK DAYS STARTING MAY 13TH
13 PF AND 1 WELDERS TO WORK NIGHTS STARTING MAY 13TH
10 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 14TH
2 PF TO WORK DAYS STARTING MAY 14TH 1 WELDER TO WORK NIGHTS STARTING MAY 15TH
1 WELDERS TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Tuesday Morning. That concludes our information. Have a great evening!
MONDAY MAY 13TH, 2024
May 13, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
AARON GRATIS WELDING@CORY COGEN
1 JY WELDER (F3/F4/ AND F6/F5 WORKING 4 X10'S 2 WEEKS PLUS
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
1 PF TO WORK NIGHTS STARTING ASAP
7 PF TO WORK NIGHTS START5ING MAY 10TH
5 PF TO WORK NIGHTS STARTING MAY 11TH
1 PF TO WORK NIGHTS STARTING MAY 13TH
(Welders must have F3/F4 & F6/F5)
FRIDAY MAY 10TH, 2024
May 10, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
AARON GRATIS WELDING@CORY COGEN
1 JY WELDER (F3/F4/ AND F6/F5 WORKING 4 X10'S 2 WEEKS PLUS
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
1 PF TO WORK DAYS AND 1 PF TO WORK NIGHTS STARTING ASAP
4 PF TO WORK DAYS STARTING MAY 10TH
7 PF TO WORK NIGHTS START5ING MAY 10TH
5 PF TO WORK NIGHTS STARTING MAY 11TH
2 PF TO WORK DAYS STARTING MAY 11TH
(Welders must have F3/F4 & F6/F5)
Shifts will change to 12 & 2 during turn around
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
10 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 12TH
1 WELDERS TO WORK DAYS STARTING MAY 13TH
14 PF AND 1 WELDERS TO WORK NIGHTS STARTING MAY 13TH
1 PF TO WORK DAYS STARTING MAY 14TH
14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH
10 PF TO WORK DAYS STARTING MAY 15TH
5 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 15TH
2 WELDERS TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Monday Morning. That concludes our information. Have a great weekend!
THURSDAY MAY 9TH, 2023
May 9, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
AARON GRATIS WELDING@CORY COGEN
1 JY PF AND 1 JY WELDER (F3/F4/ AND F6/F5 WORKING 4 X10'S 2 WEEKS PLUS
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
1 PF TO WORK NIGHTS STARTING ASAP
4 PF TO WORK DAYS STARTING MAY 10TH
7 PF TO WORK NIGHTS START5ING MAY 10TH
5 PF TO WORK NIGHTS STARTING MAY 11TH
1 PF TO WORK NIGHTS STARTING MAY 11TH
(Welders must have F3/F4 & F6/F5)
Shifts will change to 12 & 2 during turn around
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
11 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 12TH
2 WELDERS TO WORK DAYS STARTING MAY 13TH
14 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 13TH
1 PF TO WORK DAYS STARTING MAY 14TH
14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH
6 PF TO WORK DAYS STARTING MAY 15TH
8 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 15TH
2 WELDERS TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Friday Morning. That concludes our information. Have a great evening!
WEDNESDAY MAY 8th, 2024
May 8, 2024
CALLS IN
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
3 PF TO WORK DAYS STARTING ASAP
7 PF TO WORK DAYS STARTING MAY 10TH
4 PF TO WORK DAYS STARTING MAY 11TH
8 PF TO WORK NIGHTS STARTING MAY 10TH
4 PF TO WORK NIGHTS STARTING MAY 13TH
5 PF TO WORK NIGHTS STARTING MAY 13TH
(Welders must have F3/F4 & F6/F5)
Shifts will change to 12 & 2 during turn around
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
3 PF TO WORK NIGHTS STARTING MAY 10TH
2 WELDERS TO WORK DAYS STARTING MAY 12TH
14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
4 WELDERS TO WORK DAYS STARTING MAY 13TH
14 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH
10 PF AND 2 WELDERS TO WORK DAYS STARTING MAY 14TH
15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH
6 PF TO WORK DAYS STARTING MAY 15TH
12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH
3 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Thursday Morning. That concludes our information. Have a great evening!
TUESDAY MAY 7TH, 2024
May 7, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
3 PF TO WORK DAYS STARTING ASAP
7 PF TO WORK DAYS STARTING MAY 10TH
4 PF TO WORK DAYS STARTING MAY 11TH
7 PF TO WORK NIGHTS STARTING MAY 10TH
4 PF TO WORK NIGHTS STARTING MAY 13TH
5 PF TO WORK NIGHTS STARTING MAY 13TH
(Welders must have F3/F4 & F6/F5)
Shifts will change to 12 & 2 during turn around
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
3 PF TO WORK NIGHTS STARTING MAY 10TH
2 WELDERS TO WORK DAYS STARTING MAY 12TH
14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
4 WELDERS TO WORK DAYS STARTING MAY 13TH
14 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH
10 PF AND 2 WELDERS TO WORK DAYS STARTING MAY 14TH
15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH
8 PF TO WORK DAYS STARTING MAY 15TH
12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH
3 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Wednesday Morning. That concludes our information. Have a great evening!
MONDAY MAY 6TH, 2024
May 6, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4 weeks+
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
4 PF TO WORK DAYS STARTING MAY 6TH
7 PF TO WORK DAYS STARTING MAY 10TH
4 PF TO WORK DAYS STARTING MAY 11TH
8 PF TO WORK NIGHTS START5ING MAY 10TH
5 PF TO WORK NIGHTS STARTING MAY 13TH
(Welders must have F3/F4 & F6/F5)
Shifts will change to 12 & 2 during turn around
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only. Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**
3 PF TO WORK NIGHTS STARTING MAY 10TH
2 WELDERS TO WORK DAYS STARTING MAY 12TH
14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
4 WELDERS TO WORK DAYS STARTING MAY 13TH
1 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH
10 PF AND 2 WELDERS TO WORK DAYS STARTING MAY 14TH
15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH
8 PF TO WORK DAYS STARTING MAY 15TH
12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH
3 PDF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH
These calls will be called out Tuesday Morning. That concludes our information. Have a great evening
FRIDAY MAY 3RD, 2024
May 3, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4
x10's
STARTING ASAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4) Starting May 20th 4
weeks+
MELLOY INDUSTRIES
@ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons
only. Welders must have F3/F4 &
F6/F5 Shifts are 6 x 10’s**
4 PF TO WORK DAYS STARTING MAY 6TH
7 PF TO WORK DAYS
STARTING MAY 10TH
5 PF TO WORK DAYS STARTING MAY 11TH
8 PF TO WORK NIGHTS STARTING MAY 10TH
4 PF TO WORK NIGHTS STARTING MAY 11TH
1 PF TO WORK NIGHTS STARTING MAY 12TH
5 PF TO WORK NIGHTS STARTING MAY 13TH
EDMONTON EXCHANGER & CENOVUS SHUTDOWN
LLOYDMINSTER
** Please note request is for Journeypersons
only. Welders must have F3/F4 &
F6/F5 Shifts are 6 x 10’s**
3 PF TO
WORK NIGHTS STARTING MAY 10TH
2
WELDERS TO WORK DAYS STARTING MAY 12TH
14 PF
AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
4 PF AND 4 WELDERS TO WORK DAYS STARTING MAY 13TH
4 PF
AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH
13 PF
AND 3 WELDERS TO WORK DAYS STARTING MAY 14TH
15 PF
AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH
8 PF TO WORK DAYS STARTING MAY15TH
12 PF
AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH
3 PDF
AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH
THESE CALLS WILL BE CALLED OUT MONDAY MORNING. HAVE A GREAT WEEKEND!
WEDNESDAY MAY 1ST, 2024
May 1, 2024
CALLS IN:
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
BFI@ POPLAR RIVER POWER STATION IN CORONACH
5 JY Welders (F3/F4) AND 6 JY PIPEFITTER to work 12 on 2 off
Starting May 20th 4 weeks+
EDMONTON EXCHANGER @ CENOVUS SHUTDOWN LLOYDMINISTER
3 JY Pipefitters to work 6x10’s nights Starting May 7th
4 JY Pipefitters to work 6x10’s nights Starting May 10th
1 JY Pipefitter 5 JY welders to work days and 16 JY Pipefitters 5 JY Welders to work nights 6X10’S Starting May 12th
12 JY Pipefitters & 6 JY Welders to work days and 13 JY Pipefitters and 5 JY Welders to work nights 6x10’s Starting May 13th
15 JY Pipefitters &5 JY Welders to work days 15 JY Pipefitter and 5 JY Welders to work nights 6x10’s Starting May 14th
18 JY Pipefitters to work days and 13 JY Pipefitters and 10 JY Welders to work nights 6 x 10’s Starting May 15th
4 JY Pipefitters and 2 JY Welders to work 6 x10 nights Starting May 16th
(Welders must have F3/F4 & F6/F5)
Shifts will change to 12 & 2 during turn around
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER
4 JY PIPEFITTERS to work 6x10’s nights Starting May 6th
3 JY PIPEFITTERS to work 6x10’s nights Starting May 9th
9 JY PIPEFITTERS to work 6x10’s days Starting May 10th
9 JY PIPEFITTERS & 1 JY WELDER to work 6x10’s nights Starting May 10th
5JY PIPEFITTERS & 2 JY Welders to work 6x10’s days and 7 JY PF on nights as well as 2 J Y Welders on days and 2 on nights Starting May 11th
8 JY PIPEFITTERS TO WORK 6X 10’S DAYS Starting May 11th
1 JY PIPEFITTERS TO WORK 6X10’S Days Starting May 12th
3 JY PIPEFITTERS to work 6x10’s nights Starting May 12th
5 JY PIPEFITTERS & 1 JY WELDER & 1 JY WELDERS (ALLOY) to work 6x10’s nights Starting May 13th
These calls will be called out Thursday Morning . Have a great evening.
Daily Callout Archive
May, 2025 Apr, 2025 Mar, 2025 Feb, 2025 Jan, 2025 Dec, 2024 Nov, 2024 Oct, 2024 Sep, 2024 Aug, 2024 Jul, 2024 Jun, 2024 May, 2024 Apr, 2024 Mar, 2024 Feb, 2024 Jan, 2024 Dec, 2023 Nov, 2023 Oct, 2023 Sep, 2023 Aug, 2023 Jul, 2023 Jun, 2023 May, 2023 Apr, 2023 Mar, 2023 Feb, 2023 Jan, 2023 Dec, 2022 Nov, 2022 Oct, 2022 Sep, 2022 Aug, 2022 Jul, 2022 Jun, 2022 May, 2022 Apr, 2022 Mar, 2022 Feb, 2022 Jan, 2022 Dec, 2021 Nov, 2021 Oct, 2021 Sep, 2021 Aug, 2021 Jul, 2021 Jun, 2021 May, 2021 Apr, 2021 Mar, 2021 Feb, 2021 Jan, 2021