UA LOCAL 179 SASKATCHEWAN
Home - Daily Callout Information

Daily Callout Information - May, 2024

FRIDAY MAY 31, 2024

May 31, 2024
BFI FAB SHOP @ SASKTOON

 2 JY WELDERS to work days 4 x10's STARTING ASAP

SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
 
 RAM STEEL @ NUTRIEN VANSCOY

 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024
 
   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   
 
3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

11 PIPEFITTERS TO WORK DAYS STARTING ASAP

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only

15 PF TO WORK DAY STARTING ASAP 
15 PF  TO WORK NIGHTS STARTING ASAP

These calls will be called out on Monday Morning.  That concludes our information.  Have a great weekend !

THURSDAY MAY 30TH, 2024

May 30, 2024
BFI FAB SHOP @ SASKTOON

 2 JY WELDERS to work days 4 x10's STARTING ASAP

SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
 
 RAM STEEL @ NUTRIEN VANSCOY

 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

BRECK CONSTRUCTION@KEY LAKE

LOOING FOR 1 JY WELDER (F3/F4) WORK FOR 2 WEEKS ON 2 WEEKS OFF STARTING JUNE 7, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

11 PIPEFITTERS TO WORK DAYS STARTING ASAP

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

10 PF AND 3  WELDERS TO WORK NIGHTS STARTING ASAP

These calls will be called out on Friday Morning.  That concludes our information.  Have a great evening !

WEDNESDAY MAY 29TH, 2024

May 29, 2024
BFI FAB SHOP @ SASKTOON

 2 JY WELDERS to work days 4 x10's STARTING ASAP

SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
 
 RAM STEEL @ NUTRIEN VANSCOY

 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

BRECK CONSTRUCTION@KEY LAKE

LOOING FOR 1 JY WELDER (F3/F4) TO WORK 2 WEEKS ON 2 WEEKS OFF STARTING JUNE 7, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

11 PIPEFITTERS TO WORK DAYS STARTING ASAP

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

14  PF AND 3  WELDERS TO WORK NIGHTS STARTING ASAP

These calls will be called out on Thursday Morning.  That concludes our information.  Have a great evening !

TUESDAY MAY 28TH , 2024

May 28, 2024
BFI FAB SHOP @ SASKTOON

 2 JY WELDERS to work days 4 x10's STARTING ASAP

SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
 
 RAM STEEL @ NUTRIEN VANSCOY

1 JY PIPEFITTERS and 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

BRECK CONSTRUCTION@KEY LAKE

LOOING FOR 1 JY WELDER (F3/F4) WORK 2EEKS ON 2 WEEKS OFF STARTING JUNE 7, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

14  PF AND 3  WELDERS TO WORK NIGHTS STARTING ASAP

These calls will be called out on Wednesday Morning.  That concludes our information.  Have a great evening !

MONDAY MAY 27TH, 2024

May 27, 2024
BFI FAB SHOP @ SASKTOON
 2 JY WELDERS to work days 4 x10's STARTING ASAP

SOUTHEAST CONSTRUCTION @MOSAIC BELLE PLAINE
2 JY WELDERS ON NIGHTS 1 JY WELDER ON DAYS STARTING JUNE 6TH FOR 1WEEK+
 
 
RAM STEEL @ NUTRIEN VANSCOY

2 JY PIPEFITTERS and 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP



EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


14  PF AND 3  WELDERS TO WORK NIGHTS STARTING ASAP


These calls will be called out on Tuesday  Morning.  That concludes our information.  Have a great evening !

FRIDAY MAY 24TH, 2024

May 24, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
 
RAM STEEL @ NUTRIEN VANSCOY

2 JY PIPEFITTERS and 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP



EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


16 PF AND 3  WELDERS TO WORK NIGHTS STARTING ASAP


These calls will be called out on Monday  Morning.  That concludes our information.  Have a great weekend!
----------------------------------------------------------------------------------------------------------------------------------------------
COMMERCIAL CALL OUT
------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063

POW CITY @ VARIOUS PROJECTS

LOOKING FOR 3 JY PLUMBERS FOR LONG TERM JOB STARTING MAY 27TH

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap

LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.

VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.

VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.

BLACK & MCDONALD @ ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXP. To work days 5 X 8'S with potential OT. to start asap.

AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.

THURSDAY MAY 23, 2024

May 23, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
 
RAM STEEL @ NUTRIEN VANSCOY

2 JY PIPEFITTERS and 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP



EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


18  PF AND 4  WELDERS TO WORK NIGHTS STARTING ASAP

These calls will be called out Friday Morning.  That concludes our information.  Have a great evening!


COMMERCIAL CALL OUT
------------------------------------
For all jobs below, please contact Mitch Greiner at 306-956-1063

POW CITY @ VARIOUS PROJECTS

LOOKING FOR 3 JY PLUMBERS FOR LONG TERM JOB STARTING MAY 27TH

CIMCO@MCARTHUR RIVER MINE SITE

1 JY  REFRIGERATION TECH w/amonia exp.  Camp Job Travel Covered 2 weeks in 1 week out 6 month rotation to start asap

LEGACY FIRE PROTECTION @ SASKATOON (local projects)

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.

VANDERSDTELT FIRE PROTECTION@SASKATOON

2 JY SPRINKLERFITTER To work days 5 X 8'S with potential overtime to start asap.

VIKING FIRE PROTECTION@ CANOLA CRUSHING PLANT REGINA

2-3 JY SPRINKLERFITTERS To work days 5 X 8'S with potential overtime to start asap.

BLACK & MCDONALD @ ESTEVAN

2 JY REFRIGERATION TECHS W/SERVICE EXP. To work days 5 X 8'S with potential OT. to start asap.

AINSWORTH @ SASKATOON

1 JY PLUMBER experience with service and HVAC an asset. To work days 5 X 8'S with potential overtime to start asap.

These calls will be called out Friday Morning.  That concludes our information.  Have a great evening!

WEDNESDAY MAY 22, 2024

May 22, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
1 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+

RAM STEEL @ NUTRIEN VANSCOY

2 JY PIPEFITTERS and 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

3 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP



EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


18  PF AND 4  WELDERS TO WORK NIGHTS STARTING ASAP


These calls will be called out Thursday Morning.  That concludes our information.  Have a great evening!

TUESDAY MAY 21, 2024

May 21, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
1 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+

RAM STEEL @ NUTRIEN VANSCOY

4 JY PIPEFITTERS and 1 JY WELDER  TO WORK 5 X10'S DAY STARTING JUNE 3, 2024

   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

10 PIPEFITTERS AND 1 WELDER  TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP



EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


18  PF AND 4  WELDERS TO WORK NIGHTS STARTING ASAP


These calls will be called out Wednesday Morning.  That concludes our information.  Have a great evening!

FRIDAY MAY 17TH, 2024

May 17, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+

BRECK CONSTRUCTION @COTEAU CREEK 

1 JY  PIPEFITTER WORKING DAYS 4X10 STARTING MAY 27TH FOR 2 WEEKS+
   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

11 IPEFITTERS TO WORK NIGHTS STARTING ASAP

15 PIPEFITTERS TO WORK DAYS STARTING ASAP



EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


23  PF AND 6  WELDERS TO WORK NIGHTS STARTING ASAP


These calls will be called out next Tuesday Morning.  That concludes our information.  Have a great long weekend!!

THURSDAY MAY 16TH, 2024

May 16, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+

BRECK CONSTRUCTION @COTEAU CREEK 

1 JY  PIPEFITTER WORKING DAYS 4X10 STARTING MAY 27TH FOR 2 WEEKS+
   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Shifts are 6 x 10’s**

12 IPEFITTERS TO WORK NIGHTS STARTING ASAP

18 PIPEFITTERS TO WORK DAYS STARTING ASAP

 (Welders must have F3/F4 & F6/F5)

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


26  PF AND 6  WELDERS TO WORK NIGHTS STARTING ASAP


These calls will be called out  Friday Morning.  That concludes our information.  Have a great evening!

WEDNESDAY MAY 15TH, 2024

May 15, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JY PF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+

BRECK CONSTRUCTION @COTEAU CREEK 

2 JY PIPEFITTER  WORKING DAYS 4X10 STARTING MAY 27TH FOR 2 WEEKS+
   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

12 IPEFITTERS TO WORK NIGHTS STARTING ASAP

20 PIPEFITTERS TO WORK DAYS STARTING MAY 21

 (Welders must have F3/F4 & F6/F5)

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


26  PF AND 7  WELDERS TO WORK NIGHTS STARTING ASAP

1 WELDERS TO WORK DAYS STARTING ASAP


These calls will be called out  Thursday Morning.  That concludes our information.  Have a great evening!

TUESDAY MAY 14TH, 2024

May 14, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASAP
 
FUSION INDUSTRIAL CONTRACTOR @ NUTRIENT VANSCOY
2 JYPF TO WORK DAYS STARTING MAY2 7TH 1 WEEK+

SERVCO CANADA@ FAB SHOP REGINA

1JY OF ANF 1 JY WELDER WITH f6/f5 WORKING FAY 4X/10 STARTING MAY 27TH FOR 2 WEEKS+
   
MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 1 PF TO WORK NIGHTS  STARTING ASAP

7 PF TO WORK NIGHTS START5ING MAY 10TH

4 PF TO WORK NIGHTS STARTING MAY 11TH

1 PF TO WORK NIGHTS STARTING MAY 13TH

 (Welders must have F3/F4 & F6/F5)

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


6 PF AND 3 WELDERS TO WORK NIGHTS STARTING MAY 12TH

1 WELDERS TO WORK DAYS STARTING MAY 13TH

  13  PF AND 1 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  10 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

2 PF TO WORK  TO WORK NIGHTS STARTING MAY 15TH

1 WELDER TO WORK NIGHTS STARTING MAY 16TH


These calls will be called out  Wednesday Morning.  That concludes our information.  Have a great evening!

MONDAY MAY 13TH, 2024

May 13, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+

AARON GRATIS WELDING@CORY COGEN

1 JY WELDER (F3/F4/ AND F6/F5  WORKING 4 X10'S 2 WEEKS PLUS

FUSION INDUSTRIAL CONTRACTORS @ VANCOY

2 JY PF AND 1 JY WELDER TO WORK DAYS STARTING MAY 27 FOR 1 WEEK+

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 1 PF TO WORK NIGHTS  STARTING ASAP

7 PF TO WORK NIGHTS START5ING MAY 10TH

5 PF TO WORK NIGHTS STARTING MAY 11TH

1 PF TO WORK NIGHTS STARTING MAY 13TH

 (Welders must have F3/F4 & F6/F5)

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


8 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 12TH

1 WELDERS TO WORK DAYS STARTING MAY 13TH

  13  PF AND 1 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  10 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

2 PF TO WORK  DAYS STARTING MAY 14TH 1 WELDER TO WORK NIGHTS STARTING MAY 15TH

1 WELDERS TO WORK NIGHTS STARTING MAY 16TH

These calls will be called out  Tuesday  Morning.  That concludes our information.  Have a great evening!

MONDAY MAY 13TH, 2024

May 13, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+

AARON GRATIS WELDING@CORY COGEN

1 JY WELDER (F3/F4/ AND F6/F5  WORKING 4 X10'S 2 WEEKS PLUS

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 1 PF TO WORK NIGHTS  STARTING ASAP

7 PF TO WORK NIGHTS START5ING MAY 10TH

5 PF TO WORK NIGHTS STARTING MAY 11TH

1 PF TO WORK NIGHTS STARTING MAY 13TH

 (Welders must have F3/F4 & F6/F5)

FRIDAY MAY 10TH, 2024

May 10, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+

AARON GRATIS WELDING@CORY COGEN

1 JY WELDER (F3/F4/ AND F6/F5  WORKING 4 X10'S 2 WEEKS PLUS

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 
1 PF TO WORK DAYS AND 1 PF TO WORK NIGHTS  STARTING ASAP

 4 PF TO WORK DAYS  STARTING MAY 10TH 

7 PF TO WORK NIGHTS START5ING MAY 10TH

5 PF TO WORK NIGHTS STARTING MAY 11TH

2 PF TO WORK DAYS STARTING MAY 11TH 

 (Welders must have F3/F4 & F6/F5)

 Shifts will change to 12 & 2 during turn around

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


 10 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 12TH

1 WELDERS TO WORK DAYS STARTING MAY 13TH

  14  PF AND 1 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  1 PF  TO WORK DAYS STARTING MAY 14TH

  14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

10  PF TO WORK DAYS STARTING MAY 15TH

5 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 15TH

 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH

These calls will be called out Monday  Morning.  That concludes our information.  Have a great weekend!

THURSDAY MAY 9TH, 2023

May 9, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+

AARON GRATIS WELDING@CORY COGEN

1 JY PF AND 1 JY WELDER (F3/F4/ AND F6/F5  WORKING 4 X10'S 2 WEEKS PLUS

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 
1 PF TO WORK NIGHTS STARTING ASAP

 4 PF TO WORK DAYS  STARTING MAY 10TH 

7 PF TO WORK NIGHTS START5ING MAY 10TH

5 PF TO WORK NIGHTS STARTING MAY 11TH

1 PF TO WORK NIGHTS STARTING MAY 11TH 

 (Welders must have F3/F4 & F6/F5)

 Shifts will change to 12 & 2 during turn around

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**


 11 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 12TH

 2 WELDERS TO WORK DAYS STARTING MAY 13TH

  14  PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  1 PF  TO WORK DAYS STARTING MAY 14TH

  14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

 6  PF TO WORK DAYS STARTING MAY 15TH

8 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 15TH

 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH

These calls will be called out Friday  Morning.  That concludes our information.  Have a great evening!

WEDNESDAY MAY 8th, 2024

May 8, 2024
CALLS IN
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+


MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

3 PF TO WORK DAYS STARTING ASAP

 7 PF TO WORK DAYS  STARTING MAY 10TH 
 
 4 PF TO WORK DAYS STARTING MAY 11TH

 8 PF TO WORK NIGHTS STARTING MAY 10TH


 4 PF TO WORK NIGHTS STARTING MAY 13TH

 5 PF TO WORK NIGHTS STARTING MAY 13TH 

 (Welders must have F3/F4 & F6/F5)

 Shifts will change to 12 & 2 during turn around

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 3 PF TO WORK NIGHTS STARTING MAY 10TH

  2 WELDERS TO WORK DAYS STARTING MAY 12TH

 14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
 
 4 WELDERS TO WORK DAYS STARTING MAY 13TH

  14  PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  10 PF AND 2 WELDERS TO WORK DAYS STARTING MAY 14TH

  15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

  6 PF TO WORK DAYS STARTING MAY 15TH

 12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH

   3 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH

These calls will be called out Thursday Morning.  That concludes our information.  Have a great evening!

TUESDAY MAY 7TH, 2024

May 7, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+


MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 3 PF TO WORK DAYS STARTING ASAP

 7 PF TO WORK DAYS  STARTING MAY 10TH 
 
 4 PF TO WORK DAYS STARTING MAY 11TH

7 PF TO WORK NIGHTS STARTING MAY 10TH


4 PF TO WORK NIGHTS STARTING MAY 13TH

5 PF TO WORK NIGHTS STARTING MAY 13TH 

 (Welders must have F3/F4 & F6/F5)

 Shifts will change to 12 & 2 during turn around

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 3 PF TO WORK NIGHTS STARTING MAY 10TH

  2 WELDERS TO WORK DAYS STARTING MAY 12TH

 14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
 
 4 WELDERS TO WORK DAYS STARTING MAY 13TH

  14  PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  10 PF AND 2 WELDERS TO WORK DAYS STARTING MAY 14TH

  15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

  8 PF TO WORK DAYS STARTING MAY 15TH

 12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH

   3 PF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH

These calls will be called out Wednesday Morning.  That concludes our information.  Have a great evening!

MONDAY MAY 6TH, 2024

May 6, 2024
BFI FAB SHOP @ SASKTOON
1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP
 
BFI@ POPLAR RIVER POWER STATION IN CORONACH
1 JY Welders (F3/F4)  Starting May 20th 4 weeks+


MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 4 PF TO WORK DAYS STARTING MAY 6TH 

 7 PF TO WORK DAYS  STARTING MAY 10TH 
 
4 PF TO WORK DAYS STARTING MAY 11TH

 8 PF TO WORK NIGHTS START5ING MAY 10TH


 5 PF TO WORK NIGHTS STARTING MAY 13TH


 (Welders must have F3/F4 & F6/F5)

 Shifts will change to 12 & 2 during turn around
EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER
** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

 3 PF TO WORK NIGHTS STARTING MAY 10TH

  2 WELDERS TO WORK DAYS STARTING MAY 12TH

 14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH
 
 4 WELDERS TO WORK DAYS STARTING MAY 13TH

  1  PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH 

  10 PF AND 2 WELDERS TO WORK DAYS STARTING MAY 14TH

  15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH 

  8 PF TO WORK DAYS STARTING MAY 15TH

 12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH

   3 PDF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH

These calls will be called out Tuesday Morning.  That concludes our information.  Have a great evening

FRIDAY MAY 3RD, 2024

May 3, 2024

BFI FAB SHOP @ SASKTOON

 

    1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's 

     STARTING ASAP

 

      BFI@ POPLAR RIVER POWER STATION IN CORONACH

      1 JY Welders (F3/F4)  Starting May 20th 4 weeks+

 

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN IN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

4 PF TO WORK DAYS STARTING MAY 6TH

7 PF TO WORK DAYS  STARTING MAY 10TH 

5 PF TO WORK DAYS STARTING MAY 11TH        

8 PF TO WORK NIGHTS STARTING MAY 10TH

4 PF TO WORK NIGHTS STARTING MAY 11TH

1 PF TO WORK NIGHTS STARTING MAY 12TH

5 PF TO WORK NIGHTS STARTING MAY 13TH

 

EDMONTON EXCHANGER & CENOVUS SHUTDOWN LLOYDMINSTER

** Please note request is for Journeypersons only.   Welders must have F3/F4 & F6/F5 Shifts are 6 x 10’s**

3 PF TO WORK NIGHTS STARTING MAY 10TH

2 WELDERS TO WORK DAYS STARTING MAY 12TH

14 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 12TH

4  PF AND 4 WELDERS TO WORK DAYS STARTING MAY 13TH

4 PF AND 4 WELDERS TO WORK NIGHTS STARTING MAY 13TH

13 PF AND 3 WELDERS TO WORK DAYS STARTING MAY 14TH

15 PF AND 5 WELDERS TO WORK NIGHTS STARTING MAY 14TH

 8 PF TO WORK DAYS STARTING MAY15TH

12 PF AND 10 WELDERS TO WORK NIGHTS STARTING MAY 15TH

 3 PDF AND 2 WELDERS TO WORK NIGHTS STARTING MAY 16TH

 

THESE CALLS WILL BE CALLED OUT MONDAY MORNING.  HAVE A GREAT WEEKEND!

 


 

WEDNESDAY MAY 1ST, 2024

May 1, 2024

CALLS IN:


BFI FAB SHOP @ SASKTOON

1 JY PIPEFITTER AND 2 JY WELDERS to work days 4 x10's STARTING ASPAP

 

BFI@ POPLAR RIVER POWER STATION IN CORONACH

 5 JY Welders (F3/F4) AND 6 JY PIPEFITTER to work 12 on 2 off 

  Starting May 20th 4 weeks+

    EDMONTON EXCHANGER @ CENOVUS SHUTDOWN LLOYDMINISTER

3 JY Pipefitters to work 6x10’s nights Starting May 7th

4 JY Pipefitters to work 6x10’s nights Starting May 10th

 1 JY Pipefitter 5 JY welders to work days and 16 JY Pipefitters 5 JY Welders to work     nights 6X10’S Starting May 12th

 12 JY Pipefitters & 6 JY Welders to work days and 13 JY Pipefitters and 5 JY Welders to work nights 6x10’s  Starting May 13th

 15 JY Pipefitters &5 JY Welders to work days  15 JY Pipefitter and 5 JY Welders to work nights 6x10’s Starting May 14th

 18 JY Pipefitters to work days and 13 JY Pipefitters and 10 JY Welders to work nights 6 x 10’s Starting May 15th

 4 JY Pipefitters and 2 JY Welders to work 6 x10 nights Starting May 16th       

 (Welders must have F3/F4 & F6/F5)

 Shifts will change to 12 & 2 during turn around

 

MELLOY INDUSTRIES @ CENOVUS SHUTDOWN LLOYDMINISTER

 4 JY PIPEFITTERS  to work 6x10’s nights Starting May 6th

 3 JY PIPEFITTERS  to work 6x10’s nights Starting May 9th

 9 JY PIPEFITTERS to work 6x10’s days Starting May 10th

 9 JY PIPEFITTERS  &  1 JY WELDER to work 6x10’s nights Starting May 10th

 5JY PIPEFITTERS & 2 JY Welders to work 6x10’s  days and 7  JY PF on nights as well as 2 J Y Welders on days and 2 on nights  Starting May 11th

8 JY PIPEFITTERS TO WORK 6X 10’S DAYS  Starting May 11th 

1 JY PIPEFITTERS  TO WORK 6X10’S Days Starting May 12th

3 JY PIPEFITTERS  to work 6x10’s nights Starting May 12th

5 JY PIPEFITTERS  & 1 JY WELDER & 1 JY WELDERS (ALLOY) to work 6x10’s nights Starting May 13th

  These calls will be called out Thursday Morning .  Have a great evening.

 

Daily Callout Archive

May, 2025   Apr, 2025   Mar, 2025   Feb, 2025   Jan, 2025   Dec, 2024   Nov, 2024   Oct, 2024   Sep, 2024   Aug, 2024   Jul, 2024   Jun, 2024   May, 2024   Apr, 2024   Mar, 2024   Feb, 2024   Jan, 2024   Dec, 2023   Nov, 2023   Oct, 2023   Sep, 2023   Aug, 2023   Jul, 2023   Jun, 2023   May, 2023   Apr, 2023   Mar, 2023   Feb, 2023   Jan, 2023   Dec, 2022   Nov, 2022   Oct, 2022   Sep, 2022   Aug, 2022   Jul, 2022   Jun, 2022   May, 2022   Apr, 2022   Mar, 2022   Feb, 2022   Jan, 2022   Dec, 2021   Nov, 2021   Oct, 2021   Sep, 2021   Aug, 2021   Jul, 2021   Jun, 2021   May, 2021   Apr, 2021   Mar, 2021   Feb, 2021   Jan, 2021  
 

Looking for a career in the Piping Trades?

APPLY NOW

LOCAL 179 NEWS

GENERAL MEMBERSHIP MEETING MAY 24TH, 2025 REGINA

GENERAL MEMBERSHIP MEETING APRIL 26TH SASKATOON

Mark's 25% Off

GENERAL MEMBERSHIP MEETING MARCH 15TH REGINA

More News >>

MEMORIAL

Passing of UA Local 179 member Brad Gilchrist

Passing of UA Local 179 member Orest Gulka

Passing of UA Local 179 member Michael Pylychaty

Passing of UA Local 179 member Dieter Legien

More Memorial News >>

NOTICES

Unemployed Workers Help Centre If you hear family, friends, neighbors', etc mentioning they are or someone they know is having issues with EI, you can tell them that there is an outfit, the UWHC, which is supported by your union that gives help to any worker having trouble with their EI claim. Check out the website by clicking the link below: https://www.unemployedworkerscentre.org/

Mental Health And Well-being Resources

Click the image below to read

UA CANADA NEWS
FACEBOOK

UA Local 179

402 Solomon Drive, Regina, Saskatchewan S4N 5A8
Tel: 306-569-0624
Call Out Line: 306-569-3641
Email: mail@ualocal179.ca